Highway Engineering Practice Test: Highway Alignment and Project Preparation
Fast practice, instant feedback. Timer auto-submits when time’s up.
Avg score: 0% Most missed: “The report that includes all the works including soil, bridges, topography, mate…”
Highway Alignment and Project Preparation topics include: Highway alignment, engineering surveys, highway projects, detailed project report and preparation, drawings and report.   Highway alignment is the position of the highway's center line in the ground. It includes horizontal alignment and vertical alignment.  Here are some stages in a highway project: Preliminary planning, Demolition and removal, Ground leveling, Sub base layout, Binder layer pour, Asphalt application, Transitioning between new and existing roads  The following are some types of field surveys required for highway... Show more
Highway Engineering Practice Test: Highway Alignment and Project Preparation
Time left 00:00
25 Questions

1. The approximate cost of construction evaluated for the project is called __________
2. The changes in gradient and vertical curve are covered under which type of alignment?
3. The name of the work and project details is managed under which category of DPR?
4. A part of land that is acquired during the initial stages of construction for future expansion is called ____________
5. The surveys of highway alignment are completed in how many stages?
6. Embankments are provided on a highway near ___________
7. The New highway project is divided into how many stages?
8. The highly flooded areas should be re aligned by ___________
9. The cross sections should be drawn for every __________
10. The improper alignment of road will not result in __________
11. The first step in the detail checklist of DPR is ___________
12. Which of the following is prepared first during estimate?
13. To minimize the cost of the project the most suitable method is ___________
14. A closed loop used for survey purpose is called __________
15. The soil survey is conducted in which of the following survey?
16. The stability of slopes is considered while designing?
17. The index map shows __________
18. The planning, design and construction of either a network of new roads or road link is called __________
19. The DPR consists of how many components?
20. The economical option during the construction of a road around a hill is __________
21. The resisting length should be kept __________
22. The final step in the specifications and design of roadway elements is ___________
23. Which of the following types of roads are most preferred for highways?
24. Road roughness is tested by ___________
25. Which of the following is not a structure constructed for drainage purposes?