Highway Construction topics include: Highway construction features, embankment and subgrade, earth excavation, flexible pavements construction, cement concrete pavements and low volume roads. Highway construction is a civil engineering process that involves the construction, repair, or alteration of highways, streets, roads, alleys, parking areas, runways, and paths. Highway construction also includes locate, supervise, and map an area for a highway.  Highway construction contractors are responsible for: Designing and building new roads Repairing and maintaining existing roads Ensuring... Show more
Highway Engineering Practice Test: Highway Construction
Time left 00:00
25 Questions

1. Embankment are laid __________
2. The expansion joints do not consist of __________
3. The compaction of sand is done by __________
4. The rollers that uses both tamping and kneading is __________
5. What is the most commonly used type of concrete pavement?
6. An embankment is classified as high if height exceeds __________
7. What is the last step in design of embankment?
8. The embankment is constructed by using __________
9. The design life for low volume roads is __________
10. Dragline cannot excavate __________
11. If the height of embankment increases __________
12. The CC slab can be constructed in how many methods?
13. The liquid limit of soil for embankment construction is __________
14. The low volume roads are designed as __________
15. The stiff materials can be excavated by __________
16. The boom is supported by __________
17. The camber depends on __________
18. The consolidation can be achieved faster by __________
19. Stability of slopes change with __________
20. The spreading test performed on bitumen can be checked on metal plates of dimensions is?
21. The base course is generally laid in earth road for a thickness of __________
22. The critical stresses affecting the reinforced pavement is __________
23. The economical highway can be achieved by __________
24. Built up spray grout consists of __________
25. The camber is checked at every interval of __________