Software Project Management Quiz
Time left 00:00
25 Questions

1. 98.The _______ method, the activities that can proceed at the same time are ordered according to a set of simple criteria.
2. The ______makes decision alone but gives subordinates latitude in implementation
3. ________is a kind of position power based on having access to those who have power
4. COSMIC stands for ______.
5. The ____ oriented system refer to embedded control systems
6. The ¬________can be used to establish the order in which increments are to be developed
7. In quality specification, ______is the range of values within which it is planned the quality measurement value should lie.
8. The ______ chart provides a simple method of comparing actual and planned expenditure
9. The ______assessment deal deals with evaluating the functions of hardware and software.
10. The _____i option is used to find the approach of the identification of risks.
11. In ________activities are ordered according to their total float, those with the smallest total float having the highest priority.
12. In management, means taking action to remedy hold-ups
13. The ______is the extent to which a program satisfies its specifications and fulfills the users objectives.
14. ______ have proposed a socio technical model of risk
15. The people under theory Y _________.
16. In __________the scope of deliverables for an increment is rigidly constrained by an agreed deadline.
17. _______ devised the COCOMO estimating models.
18. The critical path is the ________ path through the network
19. The _____ chart is useful both during the execution of a project and post implementation.
20. .USDP stands for_______.
21. The ____ changes affect more than one part of the processing and must have to be done with the subject of a design review before they can be implemented
22. In Gantt chart, ______ provides an immediate visual indication of which activities are ahead or behind the schedule.
23. The _______means the efforts of each participant are added to get the final result
24. The UK government has sponsored PRINCE2 procedures through _____.
25. NPV stands for _________.