A painter was paid $800 as labor cost for painting the exterior of the front of a house. This amount was the painter’s estimated labor cost based on a regular rate of R, in dollars per hour, for an estimated time T, in hours. However, the actual time it took for the painter to do the job was 4 hours longer than the estimated time, thereby reducing the hourly rate for the job by $10 per hour. What is R, the painter’s regular rate, in dollars per hour?

🎲 Try a Random Question  |  Total Questions in Quiz: 100  |  🧠 Study this quiz with Flashcards
This question is part of a full practice quiz:
GMAT Quantitative: Problem Solving Practice Test 1 — practice the complete quiz, review flashcards, or try a random question.

Problem Solving questions are mixed in with Data Sufficiency questions to make up the 37 questions of the GMAT Quantitative section, which must be completed in 75 minutes. The Problems You’ll Work On When working through the problem solving questions test your understanding of: Basic math, including fractions, decimals, ratios and proportions, percents, and exponents. Probability and Statistics, including counting techniques, permutations and combinations, basic probability, arithmetic mean, median, mode, and standard deviation. Algebra, including polynomials, linear equations and... Show more

A painter was paid $800 as labor cost for painting the exterior of the front of a house. This amount was the painter’s estimated labor cost based on a regular rate of <em>R,</em> in dollars per hour, for an estimated time <em>T,</em> in hours. However, the actual time it took for the painter to do the job was 4 hours longer than the estimated time, thereby reducing the hourly rate for the job by $10 per hour. What is <em>R</em>, the painter’s regular rate, in dollars per hour?