Software Project Management Review
Fast practice, instant feedback. Timer auto-submits when time’s up.
Avg score: 21% Most missed: “A ____________ is a working model of one or more aspects of the projected system…”
Software Project Management Review
Time left 00:00
25 Questions

1. The inspection is lead by a _______who has had specific training in the technique. .
2. In traffic light method of risk reporting, _______indicates that all the activities are on target.
3. A ____________ is a working model of one or more aspects of the projected system.
4. The outcome of project analysis will be the selection of the most appropriate methods and ______.
5. An _________ may cause the project to take longer than it would otherwise.
6. In _____ step the identification of project scope and objectives.
7. The ______ chart need to be redrawn each time when target dates are revised.
8. The collection of projects that an organization undertakes within a particular planning cycle is called as _____.
9. The ____ steps in stepwise planning deals for Execute plan.
10. The _______method of project planning covers only the planning stages of a project and not monitoring and control.
11. The _______means the efforts of each participant are added to get the final result.
12. The rule of _______states that the latest date for an event is the latest start date for all the activities that may commence from that event.
13. The ______ is also known as the one-shot or once-through model.
14. The ________ analysis demands that vary each factor one at a time.
15. The _______ method, the activities that can proceed at the same time are ordered according to a set of simple criteria.
16. The _______will be of concern at all stages of project planning and execution, but will be of particular interest at the some points of stepwise frame work.
17. _______takes into account the profitability of a project and the timing of the cash flows.
18. The task called ______ will produce practical requirements to be fed into the next stage of the planning process.
19. ________is based on the idea of some kind of authority or power.
20. In a project team, the ________is a good team player who is willing to undertake less attractive tasks if they were needed for team success.
21. In project management the ____ number of types of contract in management.
22. In stepwise project planning the first step deals with ______.
23. In ISO 9126 identifies ______ software quality characteristics.
24. Groups of methods or techniques are called ____.
25. The possibility that particular assumptions are incorrect is assessed and documented in a _______.